The AHM 800-R
On sections with grade 2 mixture
The AHM 800-R is used on sections in which grade 2 mixture is installed. It is able to remove the ballast with the ballast excavating chain, crush it on the machine, mix it with new material and re-install it as a formation layer/frost layer. Installation of the new ballast is carried out in a separate operation.
Performance ø in 12 hours
300m
Max. performance per hour
60m
Ballast Excavation Chain - Capacity
300 cbm/h
Excavation width
4.000 - 4.600 mm
Subgrade Excavation Chain - Capacity
500 cbm/h
Excavation width
4.030 - 6.000 mm
Excavation depth max.
1.390 mm
Installation height up to
500 mm (PSS/FSS)
Installation height, track formation layer
300 mm
Material supply (backwards)
Container carriage
12 or 24 cbm
Evacuation (to the front)
MFS 100