Skip to content

The MFS 120/100/40/45

A long yellow ballast train, the ‘Plasser & Theurer 4334 S’, on the railway track; a worker in an orange vest is walking alongside it.

Supply material and transport the excavated material away

The material conveyor and hopper units serve both to supply material and to transport the excavated material away without using the adjacent track. Loading is carried out using a wheel loader or excavator via a loading station or directly into the MFS. The excavated material is unloaded to temporary storage sites or onto K wagons via swivelling conveyor belts.
MFS 120

Length over buffers
22,90 m
Total weight
62,00 t
Operating weight max.
180,00 t
Volumetric capacity
120 cbm
Loose material
70 cbm
Pivoting range
5,61 m
MFS 100

Length over buffers
22,90 m
Total weight
51,00 t
Operating weight max.
144,00 t
Volumetric capacity
100 cbm
Loose material
64 cbm
Pivoting range
5,40 m
MFS 40

Length over buffers
18,30 m
Total weight
37,00 t
Operating weight max.
93,00 t
Volumetric capacity
40 cbm
Loose material
32 cbm
Pivoting range
4,35 m
MFS 45

Length over buffers
17,94 m
Total weight
50,00 t
Operating weight max.
107,50 t
Volumetric capacity
45 cbm
Loose material
38 cbm
Pivoting range
4,50 m
MFS 40 in yellow.
MFS 40
MFS 45 in red.
MFS 45
A yellow track-laying excavator on ballast tracks under a blue sky.
MFS 120

Get in touch now

Personalised advice for your building project