VLA / ULW
Loading unit (VLA) Transfer wagon (ULW)
The VLA serves to round off the product range. It is used to dig up the edge paths in front of a formation rehabilitation machine. If necessary, the loading belt is extended from the MFS. The transfer wagon serves to load the excavated material at a distance of up to 8.50 m away from the track axis.
Performance
1,5 cbm/min
Width hopper
2.200 mm
Height hopper
1.200 mm