Skip to content
State‒of‒the‒art technology for underground rehabilitation.

An overview of our machines

Our specialist track-laying machines enable efficient and precise work in sub-base rehabilitation and track construction. Combining state-of-the-art technology with many years of experience, we offer high-performance solutions for a wide range of requirements on rail construction sites.

In detail

Full details of our machines
The ‘PM 1000 URM’ machine standing on a track.

PM 1000 URM

A high-performance machine for comprehensive sub-base rehabilitation in track construction. It enables existing material to be processed and reused directly during the construction process.
A large yellow PM 200-2R track-laying machine on railway tracks, with workers in the background.

PM 200-2-R

Machine for improving the subgrade and cost-effective rehabilitation of the track substructure. Existing material is processed and reused during the work process.
The ‘PM 200-1 BR/C’ machine is standing on a track, with a worker in orange overalls standing in front of it.

PM 200-1 BR/C

Modular machine for ballast cleaning and sub-base improvement. Several work steps are efficiently combined into a single continuous process.
The ‘AHM 800 R’ machine in action.

AHM 800 R

Specialised machine for the mechanical rehabilitation of railway subgrades. Excavation, processing and replacement of the material take place directly on the track.
A yellow ‘eurallippol’ machine on a railway carriage, surrounded by tracks and gravel, under a cloudy sky.

MFS 120/100/40/45

Material transport and silo wagons for the transport of bulk materials in track construction. They ensure a continuous and efficient flow of materials throughout the entire construction site.
A yellow wheel loader is filling a goods wagon with sand next to the railway tracks.

VLA/ULW

Loading and transfer trolleys for efficient material handling on construction sites. They enable flexible transfers between construction trains, conveyor systems and transport trolleys.
Machine designation
Number
PM 1000 URM
1
PM 200-2 R
1
PM 200-1 BR/C
1
AHM 800-R
1
MFS 120
8
MFS 100 (3 MFS S, 1 MFS 100 DS)
53
MFS 40
56
MFC 45
14
VLA-MFS 40 (MFS with built-in VLA)
7
VLA (Loading facilities)
3
ULW (transfer wagon, unloading up to 8.50 m from the track centre)
10
PK (Gantry cranes)
12
BA 251 / BA Beetle (846 troughs)
141
AHM tipper, 125 2-axle, 9 4-axle
134

The right solution for your track construction project

Talk to our specialists about machinery, scheduling and implementation.